65 Megawatt NSA Spy Center
(enough power for 33,000 homes)
(enough power for 33,000 homes)
ELECTRIC BILL = $1 MILLION per month
Does this fall under the category of GOVERNMENT WASTE, FRAUD, and ABUSE? Of course not.
Bluffdale, Utah--Reports are out that the $1.7 BILLION NSA Spy Center is having electric surge problems and power outages. Has anyone looked at the country's largest spy center? Take a look at these pictures and you will realize the government is hard at work to keep us all safe for democracy:
Bluffdale, Utah--Reports are out that the $1.7 BILLION NSA Spy Center is having electric surge problems and power outages. Has anyone looked at the country's largest spy center? Take a look at these pictures and you will realize the government is hard at work to keep us all safe for democracy:
http://www.dailymail.co.uk/news/article-2449938/Electrical-faults-NSAs-1-7-billion-data-center-delay-opening-Utah.html
Even Canada has their own Spy Center called the CSEC:
http://www.cbc.ca/news/politics/inside-canada-s-top-secret-billion-dollar-spy-palace-1.1930322
Even Canada has their own Spy Center called the CSEC:
http://www.cbc.ca/news/politics/inside-canada-s-top-secret-billion-dollar-spy-palace-1.1930322
...developing...